Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

GENERALAire
INSTALLER: PLEASE FILL OUT AND MAIL GUARANTEE CARD AFTER INSTALLATION
IS COMPLETE. LEAVE INSTALLATION
PRECAUTION: The installer should be an experienced service technician. Disconnect electrical power before
beginning installation. Do not install where temperatures fall below 32 degrees F or where plenum temperatures
exceed 200 degrees F. For maximum evaporative capacity, install this humidifier on the warm air supply plenum.
When wiring into a multi-speed blower circuit see Step 5C.
ADDITIONAL MATERIALS THAT MAY BE NECESSARY: 1. 1/4" diameter plastic supply tubing or 1/4" copper supply tubing for hot water applications
1
ALLOW 2 1/2 INCHES CLEARANCE
ABOVE THIS SURFACE FOR SERVICING
FOLLOW INSTRUCTIONS PACKED WITH HUMIDIFIER
1. REMOVE PROTECTIVE PAPER FROM BACK OF TEMPLATE AND STICK IN LEVEL POSITION.
2. CENTER PUNCH AND DRILL THE FOUR SIDE MOUNTING HOLES WITH A 1/8 " DIA. DRILL.
3. HANG HUMIDIFIER FROM FOUR SIDE SCREWS AND INSTALL DRAIN PAN, EVAPORATOR
PAD AND DISTRIBUTOR TROUGH.
4. TIGHTEN SCREWS AND ADJUST HUMIDIFIER UNTIL LEVEL.
5. REMARK FOUR REMAINING HOLES IF NECESSARY.
6. REMOVE HUMIDIFIER, DRILL REMAINING HOLES AND CUT OUT CENTER SECTION OF
TEMPLATE.
ALLOW 4" CLEARANCE BELOW THIS LINE FOR EASY ACCESS TO DRAIN HOSE CONNECTION.
Select location on vertical surface of warm air plenum for mounting
humidifier. Stick mounting template in place making sure the template is
level. Do not install humidifier where the blanked off ends of a cooling coil
will restrict air flow to the humidifier.
3
COPPER
TUBING
PLASTIC
TUBING
Mount the self tapping saddle valve on either a cold or a hot water pipe.
A side or top mount is best to avoid clogging from pipe sediment.
Connect 1/4" O.D. tubing to the saddle valve. Copper tubing requires a
brass compression nut and brass sleeve. Plastic tubing requires a brass
insert inside the tubing, a plastic sleeve on the outside with a brass
compression nut.
NOTE: DO NOT USE PLASTIC TUBING ON HOT WATER OR IN
CONTACT WITH ANY HOT PLENUM SURFACE OR DUCT.
INSTALLATION OF THIS SADDLE VALVE MUST MEET OR EXCEED
LOCAL CODES AND ORDINANCES.
R
R
ESIDENTIAL
2. air pressure switch (G.F. Model #12500 suggested)
3. junction box, 115 V. grounding outlet, cover and wire
Top Of Template
TEMPLATE FOR INSTALLING
POWER HUMIDIFIER
WHEN INSTALLING ON BASEMENT TYPE FURNACE, EXTEND THIS LINE
FOR LOCATING HOLE ON ADJACENT PLENUM
CUT ON THIS LINE
TEMPLATE NO. 1137
IF FURNACE JACKET EXTENDS MORE THAN 3" OUTWARD FROM THE PLENUM SURFACE
A
T
IR
REATMENT
INSTRUCTIONS WITH HOME OWNE R
2
Center punch all 6 mounting holes on the template and drill with an
1/8" drill bit. Cut out center section. Install one cabinet retaining clip
in each of two top holes to assist holding cabinet while installing six
cabinet screws. Install drain pan, evaporator pad and distributor
trough using thumb nuts provided.
SADDLE VALVE INSTALLATION INSTRUCTIONS
Copper Pipe
1. Retract piercing pin into valve body by turning handle
counterclockwise.
2. Screw valve body into upper bracket and tighten.
3. Place rubber gasket over piercing pin.
4. Assemble saddle valve over copper pipe using enclosed screws,
nuts and lower bracket.
5. Tighten screws evenly and firmly. Brackets should be parallel.
6. Complete compression connection to saddle valve outlet.
7. Turn handle clockwise to pierce tubing and close saddle valve.
8. Turn handle counterclockwise to open saddle valve, leave open for
several seconds to flush dirt from pipe and tubing.
Steel, Brass or Hard Plastic Pipe
1. Shut off water supply and drain pipe.
2. Turn handle clockwise to expose piercing pin and close saddle
valve.
3. Place rubber gasket over piercing pin.
4. Drill 1/8" hole in pipe using a hand crank drill to avoid shock hazard.
5. Assemble saddle valve over steel, brass or hard plastic pipe using
enclosed screws, nuts and lower bracket.
6. Tighten screws evenly and firmly. Brackets should be parallel.
7. Complete compression connection to saddle valve outlet.
8. Turn handle counterclockwise to open saddle valve, leave open for
several seconds to flush dirt from pipe and tubing.
Threaded Pipe Fittings
1. Turn handle clockwise to expose piercing pin and close saddle
valve.
2. Seal valve body threads using pipe tape or sealant.
3. Install valve into 1/8" NPT fitting.
4. Complete compression connection to saddle valve outlet.
5. Turn handle counterclockwise to open saddle valve, leave open for
several seconds to flush dirt from pipe and tubing.
1137 SERIES
P
RODUCTS
FLOW THROUGH
POWER HUMIDIFIER
FOR INSTALLATION ON A VERTICAL
SURFACE OF THE WARM AIR PLENUM
OF ANY FORCED AIR FURNACE

Publicité

Table des Matières
loading

Sommaire des Matières pour GeneralAire 1137 Serie

  • Page 1 GENERALAire 1137 SERIES ESIDENTIAL REATMENT RODUCTS FLOW THROUGH INSTALLER: PLEASE FILL OUT AND MAIL GUARANTEE CARD AFTER INSTALLATION POWER HUMIDIFIER IS COMPLETE. LEAVE INSTALLATION INSTRUCTIONS WITH HOME OWNE R FOR INSTALLATION ON A VERTICAL PRECAUTION: The installer should be an experienced service technician. Disconnect electrical power before SURFACE OF THE WARM AIR PLENUM beginning installation.
  • Page 2: Circuit Description

    INSTRUCTIONS FOR WIRING Please refer to the installation instructions included with the Humidistat. Assemble distributor tube so that it is directed into the center opening of the distributor trough cover. Connect 1/4" water DO NOT USE supply tube to brass filter at inlet of solenoid. PLASTIC TUBING IN CONTACT WITH ANY HOT PLENUM SURFACE OR DUCT.
  • Page 3: Generalaire

    GENERALAire HUMIDIFICATEUR PUISSANT ESIDENTIAL REATMENT RODUCTS À CIRCULATION DIRECTE MODÈLE 1137 INSTALLATEUR : VEUILLEZ REMPLIR ET POSTER LA CARTE DE GARANTIE UNE FOIS L'INSTALLATION TERMINÉE. LAISSER LES DIRECTIVES D'INSTALLATION AU PROPRIÉTAIRE DE LA MAISON. PRÉCAUTION : L'installateur doit être un technicien qualifié et expérimenté. Couper l'alimentation électrique POUR L'INSTALLATION SUR UNE avant de commencer l'installation.
  • Page 4: Instructions Pour Le Câblage

    INSTRUCTIONS POUR LE CÂBLAGE Veuillez consulter la notice d'installation fournie avec l'humidistat. Monter le tuyau du distributeur de façon qu'il se dirige vers l'ouverture centrale du couvercle du bac de distributeur. Raccorder le tuyau d'alimentation d'eau de 1/4 po au filtre en laiton de l'entrée du solénoïde.
  • Page 5 INSTRUCTIONS FOR WIRING Please refer to the installation instructions included with the Humidistat. Assemble distributor tube so that it is directed into the center opening of the distributor trough cover. Connect 1/4" water DO NOT USE supply tube to brass filter at inlet of solenoid. PLASTIC TUBING IN CONTACT WITH ANY HOT PLENUM SURFACE OR DUCT.
  • Page 6 990-37-76 ORIFICE & STRAINER ASSEMBLY 1137-3 DRAIN PAN 990-16-76 ORIFICE FITTING P-163 HOSE CLAMP 990-17 STRAINER SCREEN 1099-16 DRAIN TUBE 990-18 STRAINER BODY GENERALAire ESIDENTIAL REATMENT RODUCTS FILL OUT AND MAIL THIS WARRANTY CARD AND LITERATURE REQUEST FORM LEANERS AND...
  • Page 7 PARTS LIST FOR HUMIDIFIER 1137-24 DISTRIBUTOR TUBE 1099-9 THUMB NUT 1137-35 TROUGH COVER 1137-4 DISTRIBUTOR TROUGH 1137-2 FAN SHROUD 990-13 EVAPORATOR PAD 1137-9 FAN BLADE 1137-20 FAN GUARD SOLENOID VALVE ASS'Y 1137-17 1137-7 WIRING BRACKET 40-7 TINNERMAN NUT 1137-8 MOTOR 1137-50 COOLING FAN 1137-26 RELAY ASS'Y 1137-39 FRONT COVER...
  • Page 8: Care And Maintenance

    GENERAL FILTERS, INC. 43800 GRAND RIVER AVE. NOVI, MICHIGAN 48375-1115 WWW.GENERALAIRE.COM CANADIAN GENERAL FILTERS, LTD. 39 CROCKFORD BLVD. SCARBOROUGH, ONTARIO M1R3B7 CARE AND MAINTENANCE Your Humidifier is engineered to give helpful and trouble-free humidification. For maximum efficiency the following cleaning procedures should be carried out at the end of each heating season: 1.

Table des Matières