Installation And Operating; Installing; Connecting The Load - Goobay 20319 Mode D'emploi

Masquer les pouces Voir aussi pour 20319:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

User's Manual
4

Installation and Operating

• Observe the maximum current and power values specified in chapter
Permitted input values must not be exceeded.
4.1

Installing

1. Check the scope of delivery for completeness and integrity.
2. Check all test leads and feeler heads for defective isolation.
3. Place the power supply on a safe surface and connect the mains cable
2. Connect the load correctly to the DC outputs of the power supply.
3. Switch on the power supply.
4. Adjust the individual current and voltage.
4.2

Connecting the Load

Fig. 3: Connecting the Load
1. Connect the load like shown in figure 4.
2. Switch on the power supply and the load.
14
Risk of injury by stumbling and falling
Mind placing cables in a way, nobody will be disabled and the cable not
be damaged.
Install the system and devices attached to it in a way that persons can
not be injured, or objects not be damaged for example by dropping or
stumbling.
Material damage due to wrong placement and
wrong voltage supply
Operate the device only on fireproof, level, dry and non-conductive, as
well as safe surfaces.
Drive the product only with earthed 220-240 V ~ / 50 - 60 Hz a.c. net
works.
Do not overload the device.
2.4. „Specifications".
Mind the ventilation and heat reduction at full load.
Led the device acclimate after transporting until room temperature is
reached, before use.
Place the device in a way, reaching the operating elements without problems.
to a 220-240V AC mains socket.

Publicité

Table des Matières
loading

Produits Connexes pour Goobay 20319

Ce manuel est également adapté pour:

20327

Table des Matières