Télécharger Imprimer la page

During Assembly - forest-style SHELTY Instructions De Montage

Masquer les pouces Voir aussi pour SHELTY:

Publicité

EN
The essentials to enjoy your Forest Style shed
1 Before assembly
 Your concrete floor is :
- Levelled,
- Fitting the exterior dimensions of the shed +2cm,
- With a waterproof membrane,
 You have made the inventory of the sheds' component,
 You store your shed in a covered, ventilated and flat place before
assembly in order to prevent mold and wood deformation,
 You protect the plank of the lower belt of the shed from direct contact
with the concrete floor with a waterproofing product (bituminous coating
type) to prevent rising damp by capillary action,
 In the event of a dispute, you send your dealer a service request
accompanied by a photo of the damaged item as well as the quality control
sheet attached to the instructions. Without these elements the dispute
cannot be taken into account.

2 During assembly

 You do not screw any element without pre-drilling it first,
 You take care not to join the planks together (shelves, brackets, rails) so
as not to prevent the expansion of the wood.
3 After assembly
 If the shed is not treated, you apply an insecticide, fungicide product.
You let the elements dry for 72 hours,
 You apply 2 layers of water-repellent and anti-UV microporous stain to
your shed (interior and exterior), you regularly renew the stain depending
on the state of wear,
 You regularly clean and check the wear condition of the bituminous felt
and replace it when necessary,
 You carefully keep all the documents attached to the product.

Publicité

loading

Ce manuel est également adapté pour:

003255