Installation; Building The Structure - HOME REFINEMENTS JULIEN Guide D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

STRUCTURE PREPARATION AND ASSEMBLY
HOME REFINEMENTS outdoor kitchen modules and built-in cabinets are installed in a solid structure. Special
attention must be paid to the following points to ensure that the installation of the cabinets goes smoothly.
The corners must be 90
The structure must resist humidity to avoid long-term deformation. Choose the material accordingly.
A slight gap between the floor and the frame of the structure will prevent the accumulation of water at the
foot of the structure and allow the surfaces to dry properly.
The use of non-combustible materials is recommended if the installed cooking appliances generate heat.
All gas and plumbing lines must be connected prior to cabinet installation.

BUILDING THE STRUCTURE

1.
Build the structure with openings for the installation of your chosen cabinets. The specific opening
dimensions needed for each cabinet are available on the product data sheet.
Have the piping and gas installed by a professional at this stage (non-illustrated) before applying the
finishing materials.
1
Opening height
Opening widht
and square.
0
90
0
Stud position and shape for guidance only.
Use non-combustible materials if possible.
27

Publicité

Chapitres

Table des Matières
loading

Table des Matières