Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Preparations for installation
1.
Connect the power cable to the hood; insert the cable
clamp with the appropriate screw.
Note: if the extractor is installed in the filtering version,
apply the smoke non-return valve.
Installation on the bottom of the wall unit
2.
Apply the drilling template on the bottom of the wall unit
3-4. Drill the holes for the passage of screws, for the drain
hole and for the electric cable.
5-6. Note: Repeat the drilling for the exhaust pipe and electric
cable also on the ceiling or on the back of the wall unit as
needed.
7.
Install the hood with the screws. Proceed with the
adjustment of the drawer depth (see instructions under
"Adjusting the depth of the drawer").
8.
Remove the grease filter/s.
Adjusting the depth of the drawer
9.
Install the adjustment brackets and secure them with the
screws (not fully tighten).
Push the drawer into the desired position and tighten the
screws securing the adjustment brackets that will work as
"closing stop" for the drawer.
Proceed with finalizing the installation (see instructions
under "Finalizing Installation").
Finalizing Installation
10-11.Install an exhaust tube sufficiently long to reach the top
of the wall unit (recirculation version) or outside (ducted
version).
Perform also the cable connection to the power supply of
the house.
Note : apply the adapter flange is necessary
12. Install the charcoal filters if you decide to use the hood in
recirculation mode, otherwise cannot be used.
13. Reinstall the grease filter/s.

Operation

The hood is fitted with a control panel with aspiration speed
selection control and a light switch to control cooking area
lights.
a.
ON/OFF light switch
b. Speed 1/OFF switch
c.
2-speed selection
d. 3-speed selection
22

Publicité

Table des Matières
loading

Table des Matières