Kermi x-net Instructions De Service page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 6
2B
On the top of the large pipe bundle, use a suitable
knife to carefully cut a round hole of about Ø 50 cm in
the packaging film. Do not damage the system pipe!
WARNING
Risk of injury!
Use a suitable knife for cutting!
2C
Break out round perforations in the top and bottom of
the cardboard packaging.
2B 2C
Carefully place the large pipe bundle at the centre
of the unfolded support arms of the x-net unwinder
(before mounting the rotating turret).
Pull out the rotating turret for the large pipe bundle.
Check that the locking bolt engages.
Place the rotating turret with flange pointing vertically
downward (the 3 holes in the flange aligned with the
3 screw heads on the rotating turret mounting) onto
the rotating turret mounting. Turn the rotating turret
until the locking bolt engages automatically in the
hole provided in the mounting.
3B 3C
3A
Carefully cut through the black strapping tapes (tem-
porary bindings) on the inside of the pipe bundle. Do
not damage the system pipe!
WARNING
Risk of injury!
Use a suitable knife for cutting!
Pass the start of the pipe through the guide ring on
the guide lever, then insert the guide lever into the
hole in the top of the rotating turret.
Start the unwinding process by making a pulling
movement on the start of the pipe.
Disassembly of the rotating turret
Pull the locking bolt vertically upward. Turn the
rotating turret back until it can be removed from the
rotating turret mounting.
5

Publicité

Table des Matières
loading

Table des Matières