Télécharger Imprimer la page

Publicité

Liens rapides

Parts Included
A. (2) Shelves
B. (1) Telescopic Post
C. (2) Universal Mounting Plates
D. (2) Bearing Hubs
E. (2) Bearing Pins
F. (8) #8 x 1/2" screws
C. (2) Universal
Mounting Plates
B. Telescopic Post
D. (2) Bearing Hubs
A. (2) Shelves
E. (2) Bearing Pins
F. (8) #8 x 1/2˝
Screws
Tools Required
• Phillips Screwdriver
• Ruler
• Pencil
• Drill with 1/16" diameter drill bit
Product Assemblies
PFN18
PFN20
PFN24
PFN28
PFN32
KNAPE & VOGT MANUFACTURING COMPANY
P.O. Box 191, Muncie, IN 47308
0.899.6536 • 765.288.8730 • Fax 765.288.0851 • www.kv.com
Step 1 Use installation template to mark and drill 1/16˝
Step 2 Fasten each of the universal mounting plates with
Step 3 Insert bearing hubs into the underside of each of
Step 4 Slide the shelves onto the lower portion of the
Set Screw
Step 5 Place the assembly into the cabinet. Align the
Step 6 Loosen the set screw
Step 7 Insert second bearing pin into one of
POLYMER FULL-ROUND
LAZY SUSAN
Installation Instructions
Inspect all parts and read all instructions prior to beginning assembly and installation.
pilot holes for universal mounting plates in top and
bottom interior of cabinet.
(2) #8 x 1/2˝ screws using the slots so that future
adjustment can be made, if necessary.
the shelves. Note that the keyway on the side of
the bearing hub must be aligned with the key on
the inside of the shelf.
telescopic post from the bottom (slotted side).
bottom of the telescopic post over the top of
the bottom universal mounting plate making
sure that the slot in the post fits over the lug in
the mounting plate. Push a bearing pin through
the slot in the pole
and the hole in the
mounting plate. Slide
the bottom shelf
down onto the pin.
that holds the upper
portion of the telescopic
post enough to allow the upper portion
to move. Slide the upper portion up
onto the top universal mounting plate
so that it is engaged securely. Tighten
the set screw to hold the upper and
lower portions of the post together
securely.
the post's upper holes to give desired
shelf separation. Slide top shelf down
over it.
Your installation is complete! Please
affix the enclosed "Care Instructions"
to an inside wall of the cabinet for
future reference.
steps 1 & 2
step 3
step 4
steps 5, 6, & 7
RN-205EFS 02/03

Publicité

loading

Sommaire des Matières pour Knape & Vogt PFN18

  • Page 1 • Drill with 1/16” diameter drill bit so that it is engaged securely. Tighten the set screw to hold the upper and Product Assemblies lower portions of the post together PFN18 securely. PFN20 PFN24 Step 7 Insert second bearing pin into one of PFN28 the post’s upper holes to give desired...
  • Page 2 NOTICE DE MONTAGE INSTRUCCIONES DE Liste des pièces INSTALACIÓN Plateau tournant circulaire en . (2) Plateaux polymère . (1) Axe télescopique La charola giratoria redonda/ . (2) Plaques de montage universelles completa de polímero . (2) Moyeux de roulement Inspectez toutes les pièces et lisez toutes les Inspeccione todas las piezas y lea todas las .

Ce manuel est également adapté pour:

Pfn20Pfn24Pfn28Pfn32