Sound4you WBS20 Mode D'emploi page 19

Haut-parleur stéréo bluetooth portable
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
Recharging time
Connector
Dimension
Weight
Protection class
Cleaning and maintenance
This product is maintenance free. You must
disconnect the device from the mains socket before
cleaning.Ensure that no liquids get into the product
while you are cleaning it. The use of solvent-
containing or aggressive cleaning agents as well as
alcohol or thinners is prohibited as it could damage
the coating or the surface of the product. You
should therefore clean the product with a lint-free,
ever so slightly damp soft cloth only.
Disposal
The product is delivered in packaging made of recyclable
materials to protect against damage during transport. Sort
and dispose of these materials in the designated
containers. Ask your local disposal company or
local council about how to dispose of the product
in an environmentally correct way.Do not dispose
of batteries or electric and electronic devices in the
normal household waste. The consumer is legally
obliged to return electrical and electronic devices,
and batteries that are at the end of their useful life
to the point of sale or public collection points that
have been set up for this purpose. Legislation in the
country of use stipulate the specific requirements
regarding disposal. The symbol on the product,
the user guide or the packaging indicates this legal
requirement.
Approx. 2.5 h
2x Micro-USB socket, 2x 3.5 mm jack
socket
116 x 90 x 86 mm
1403 g
IPX7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

661682

Table des Matières