Télécharger Imprimer la page

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

INSTRUCTIONS
Before you begin, please check to ensure you have all the parts. Read ALL directions before beginning.
Description
No.
Shower Head
1
2
Elbow Fitting
Connection Fitting
3
4
Handle
5
Hose Connector
6
Teflon Tape
Base Hardware
7
8
Base
9
Connection Fitting
10
Faucet
Installation
In order to get the most satisfaction and pleasure from your shower,
please pay attention to the following details:
1. The solar shower must be installed on the portable base to make
sure it is stable and safe for user.
2. The solar shower includes a base plate. This has 4 prefabricated
holes for attaching the main shower body.
3. Assemble two of the base plates together, do the same with
the other two, and then put these two assemblies together to form
the whole base before attaching main shower body.
4. Install the solar shower in a location with optimal sunshine.
5. Connect the inlet of the solar shower to your home's water system
using a standard garden hose.
6. Make sure you have a valve installed before the inlet of the solar
shower for turning the water on and off.
7. To prevent being scalded by hot water, ALWAYS make sure the
shower valve is in the cold water position (blue) before turning on
the shower, then turn the valve on and gradually adjust the water toward the hot water position (red), until reaching the
desired temperature.
8. WARNING! When exposed to very strong sun rays, the water temperature coming from the solar shower may reach
temperatures as high as 140˚ F (60˚ C).
Step 1
12/19
Qty.
Part No.
NUP10231
1
1
NUP1001
1
NUP1002
1
NUP1003
NUP1004
1
1
NUP1005
NUP1006
1
NUP1007
4
NUP1002
1
1
NUP10241
Step 2
Shower Head
Fitting
Step 4
Step 5
3. Connection Fitting
2. Elbow Fitting
Washer 2
Washer 1
Coupler 2
Coupler 1
1. Shower Head
NOTE: Use Teflon tape (6)
on all threaded fittings.
Setscrew
Cover
4. Handle
9. Connection Fitting
10. Foot Faucet
8. Base
Step 3
Cover
Cover
Step 6
Base
NU1630
Main
Shower
Body
See last page
for connection
instructions
Washer 3
5. Hose Connector
7. Base Hardware
Ground
Handle
Handle
Screw
Setscrew
Hose
Connection
Gasket
Inlet Port

Publicité

loading

Sommaire des Matières pour ISLAND RETREAT NU1630

  • Page 1 INSTRUCTIONS NU1630 Before you begin, please check to ensure you have all the parts. Read ALL directions before beginning. Description Qty. Part No. 3. Connection Fitting Shower Head NUP10231 2. Elbow Fitting NUP1001 Elbow Fitting Connection Fitting NUP1002 Washer 2...
  • Page 2 INSTRUCTIONS (Cont.) 12/19PS Initial Set-up of the Shower 1. Turn shower handle to FULL ON HOT position. 2. Turn on water supply to garden hose to fill shower. Shower will take about 2 minutes to fill. NOTE: Filling tube with valve in hot position ensures no air pockets are trapped in shower.
  • Page 3 INSTRUCTIONS NU1630 Avant de commencer, assurez-vous d’avoir toutes les pièces. Lire toutes les instructions avant de commencer. Description Qté. de pièce 3. Écrou de blocage Pomme de douche NUP10231 2. Raccord coudé NUP1001 Raccord coudé Écrou de blocage NUP1002 Rondelle 2...
  • Page 4 INSTRUCTIONS (suite) 12/19PS Configuration initiale de la douche 1. Tournez la poignée dans la position FULL ON HOT 2. Ouvrez l’alimentation de l’eau du tuyau d'arrosage pour remplir la douche, cela ne prend que deux minutes environ. NOTE : en remplissant avec le robinet à la position HOT, vous vous assurez qu’il n’y aucune poche d'air emprisonnée dans la douche.
  • Page 5 NOTICE!!! PLEASE USE THE PROVIDED QUICK CONNECT HOSE ADAPTOR TO EASILY ATTACHED YOUR STANDARD GARDEN HOSE TO THE NU1630 SOLAR SHOWER STEP 1 STEP 4 STEP 2 STEP 5 STEP 3 STEP 6 – MAKE SURE TO PULL BACK ORANGE SLIDING LOCK MECHANISM AND FIRMLY PRESS BLACK CONNECTOR PIECE INTO QUICK CONNECT PART.