Télécharger Imprimer la page

Greenlee 200B-G Manuel D'instructions page 5

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
Purpose of this Manual
This instruction manual is intended to familiarize all personnel
with the safe operation and maintenance procedures for the
Greenlee 200B-G and 200EP-G Tone Probes.
Keep this manual available to all personnel.
Replacement manuals are available upon request at no charge
at www.greenlee.com.
Operation
1. Connect the leads of a Greenlee tone-sending test set
(e.g. 77HP) as follows:
a. Pair Identification, to the two wires of the pair.
See Figure 2a.
b. Single Conductor/Cable Tracing: Connect the RED lead to
the subject wire and the BLACK lead to earth or ground.
See Figure 2b.
Note: Refer to the instruction manual provided with the tone
generator for more details.
Figure 2a. Pair Tracing
Figure 2b. Cable Tracing
5

Publicité

loading

Ce manuel est également adapté pour:

200ep-g