Télécharger Imprimer la page

Publicité

Liens rapides

S RIE S SERIES
MANUEL D'INSTALLATION
INSTALLATION MANUAL
LOT
MURALE
GONDOLA
WALL UNIT
MANUFACTURIER D' TAG RES M TALIQUES ET SYST MES D'ENTREPOSAGE
8501, Jarry Est, Montr al (QC)
Canada H1J 1H7
service
la client le : 1 800 351-3125

Publicité

loading

Sommaire des Matières pour Etalex S Serie

  • Page 1 S RIE S SERIES MANUEL D'INSTALLATION INSTALLATION MANUAL MURALE GONDOLA WALL UNIT MANUFACTURIER D' TAG RES M TALIQUES ET SYST MES D'ENTREPOSAGE 8501, Jarry Est, Montr al (QC) Canada H1J 1H7 service la client le : 1 800 351-3125...
  • Page 2 COMPOSANTES ITEM #5 ITEM #9 PIED PLINTHE OUVERT ITEM #1 ITEM #2 ITEM #6 ITEM #10 CAP FINITION POTEAU HD SS TABLETTE SUP RIEURE DOS MASONITE POTEAU UNI / PERFOR ITEM #3 ITEM #7 COUVERT DE PIED SUPPORT DROIT GAUCHE ITEM #4 ITEM #8 ITEM #11...
  • Page 3 COMPOSANTES ITEM #12 ITEM #13 ITEM #14 TRAVERSE SUP RIEURE TRAVERSE CENTRALE TRAVERSE INF RIEURE ITEM #15 ITEM #16 ITEM #17 TRAVERSE INTERM DIAIRE ATTACHE MURALE CAP EN PLASTIQUE OUTILS PERCEUSE LECTRIQUE NIVEAU MAILLET EN CAOUTCHOUC NIVELEUR TITRE DESSIN PAGE S RIE S INS-201004 S SERIES...
  • Page 4 VUE EXPLOS E MURALE S RIE S LISTE DE MATERIEL ITEM DESCRIPTION CAP FINITION POTEAU POTEAU HD SS COUVERT DE PIED GAUCHE (LOWBASE) COUVERT DE PIED DROIT (LOWBASE) PIED TABLETTE SUP RIEURE SUPPORT DROIT TABLETTE DE BASE PLINTHE OUVERTE DOS MAS UNI/PERF DOS MAS UNI/PERF TRAVERSE SUPERIEURE TRAVERSE CENTRALE...
  • Page 5 TAPE 1 TRACER UNE LIGNE DE REP RE SUR LE SOL POUR LOCALISER DE LA RANG E, TENDRE LES POTEAUX (ITEM#2), LES TRAVERSES (ITEM#12-13-14), LES PIEDS (ITEM#5) ET LES PLINTHES (ITEM#9) AU LONG DE LA LIGNE. ITEM#2 ITEM#12 ITEM#5 ITEM#14 LIGNE DE REP RE ITEM#9...
  • Page 6 INSTALLATION D'UNE MURALE INS RER VERTICALEMENT L'ATTACHE MURALE L'ARRI RE DU POTEAU. FAIRE PIVOTER L'ATTACHE DE 90 DE MANI RE LA BLOQUER EN PLACE. S CURISER LE TOUT EN La FIXANT AU MUR AVEC LES VIS BOIS T TE PLATE NO 8 X 1/2" L SUR LE BLOCAGE. VIS BOIS T TE PLATE ITEM#16 NO 8 X 1 1/2"...
  • Page 7 TAPE 3 AJUSTER LE NIVELEUR DU PIED 3/4" ET LE NIVELEUR DU POTEAU 1/2". NOTE L'ING NIERIE PEUT DEMANDER DES ATTACHES DE PIEDS ET DES ANCRAGES B TON POUR CHAQUE POTEAU. IMPORTANT L'IL T DOIT TRE NIVEL CORRECTEMENT ET NIVEAU. TAPE 4 INSTALLER LES TRAVERSES ET LES DOS MASONITES:...
  • Page 8 TAPE 5 INSTALLER LA PLINTHE OUVERTE (ITEM#9) SUR LE DEVANT DES PIEDS POUR STABILISER LA STRUCTURE. ITEM#9 TAPE 6 METTRE NIVEAU EN AJUSTANT LES NIVELEURS L'AVANT ET L'ARRI RE AFIN DE S'ASSURER QUE LA STRUCTURE EST DE NIVEAU (HORIZONTAL). CECI EST N CESSAIRE ET FACILITE L'INSTALLATION DES TABLETTES ET DES ACCESSOIRES.
  • Page 9 TAPE 8 GLISSER LES COUVERTS DE PIED (ITEM#4-5) EN PLACE, LES CAPS DE FINITION POTEAU (ITEM#1) CHAQUE EXTR MIT ET LES CAPS EN PLASTIQUE SUR CHAQUE POTEAU. ITEM# 17 ITEM#1 ITEM#1 COUVERT DE PIED GAUCHE (ITEM#4) ITEM#17 COUVERT DE PIED DROIT (ITEM#5) NOTE...
  • Page 10 CHARTE MASONITE POTEAU VS DOS TITRE DESSIN PAGE S RIE S INS-201004 S SERIES I:\dessins\INSTRUCTION\INS-201\INS-201004.idw...
  • Page 11 Ne pas combiner les produits Etalex avec Aucune tablette ou accessoire ne doit des produits non Etalex. d passer le devant de la tablette de base.
  • Page 12 CALCUL DES ILOTS D S QUILIBR POUR LES MURALES CHARG ES LOURDEMENT OU LORS DE CHARGEMENT OU DE D CHARGEMENT D LOTS, IL EST IMPORTANT DE D TERMINER SI VOUS CR EZ UNE CHARGE MAL QUILIBR E QUI EXC DE LE MAXIMUM PERMIS.
  • Page 13 COMPONENTS ITEM #5 ITEM #9 BASE SHOE OPEN KICK PLATE ITEM #1 ITEM #2 ITEM #6 ITEM #10 UPRIGHT END SS HD POST UPPER SHELF MASONITE BACK COVER (UPRIGHT) PLAIN/PERFORATED ITEM #3 ITEM #7 LEFT SHOE BRACKET COVER ITEM #4 ITEM #8 ITEM #11 RIGHT SHOE...
  • Page 14 COMPONENTS ITEM #12 ITEM #13 ITEM #14 TOP CROSS-BAR CENTER CROSS-BAR BOTTOM CROSS-BAR ITEM #15 ITEM #17 ITEM #16 INTERMEDIATE CROSS-BAR PLASTIC CAP WALL ANCHOR BRACKET TOOLS DRILL LEVEL RUBBER MALLET LEVELER KEY TITLE DRAWING PAGE S RIE S INS-201004 S SERIES I:\dessins\INSTRUCTION\INS-201\INS-201004.idw...
  • Page 15 EXPLODED VIEW S SERIES WALL UNIT PART LIST ITEM DESCRIPTION UPRIGHT END COVER SS HD POST (UPRIGHT) LEFT SHOE COVER RIGHT SHOE COVER BASE SHOE SS-LB UPPER SHELF BRACKET BASE SHELF OPEN KICK PLATE MASONITE BACK PLAIN/ PERFORATED MASONITE BACK PLAIN/ PERFORATED TOP CROSS-BAR CENTER CROSS-BAR BOTTOM CROSS-BAR...
  • Page 16 STEP 1 TRACE A CHALK LINE ON THE FLOOR FOR DESIRED LOCATION OF GONDOLA AND LAY DOWN THE FEET (ITEM#1), POSTS (UPRIGHT) (ITEM#2), OPEN KICK PLATE (ITEM#9) AND THE CROSS-BARS (ITEM#10-11-13) ALONG THE CHALK LINE. ITEM#2 ITEM#10 ITEM#3 ITEM#13 CHALK LINE ITEM#9 ITEM#11 STEP 2...
  • Page 17 INFORMATION FOR ANCHOR ONLY REQUIRE FOR THE WALL UNIT INSTALL THE WALL ANCHOR BRACKET (ITEM#15) ON THE WALL AT THE TOP OF EACH POST (UPRIGHT). INSERT THE TOOTH OF THE ANCHOR IN THE FIRST SLOTS FROM THE BACK BY TURNING IN THE POSITION UPRIGHT. AS SOON THE TOOTH IS IN PLACE, PUT IT BACK ON THE HORIZONTAL POSITION AND FIX IT WITH THE WOOD SCREW NO 8 X 1 1/2"...
  • Page 18 STEP 3 ADJUST THE BASE FOOT LEVELING SCREW AT 3/4" AND THE UPRIGHT POST LEVELING SCREW AT 1/2". NOTE ENGINEERING MAY SUGGEST THE USE OF THE ANCHOR FOOT BRACKETS SECURED WITH ANCHORS BOLT 1/4" X 2 1/4"L FOR IMPORTANT EACH POST, INTO THE FLOOR. THE GONDOLA MUST BE LEVELED AND CORRECTLY ADJUSTED.
  • Page 19 STEP 5 INSTALL THE OPEN KICK PLATE (ITEM#9) IN THE FRONT OF THE BASE SHOES TO STABILIZE THE UNIT BY SLIDING THE FRONT FRAME FROM THE TOP INTO THE BRACKETS. ITEM#9 STEP 6 LEVEL THE UNIT HORIZONTALY, BY ADJUSTING THE LEVELERS IN THE FRONT AND IN THE BACK OF THE FEET TO ENSURE THE STRUCTURES ARE LEVELED AND PLUMB.
  • Page 20 STEP 8 INSTALL THE UPRIGHT END COVER (ITEM#1) ON BOTH EXTREMITY, SLIDE THE SHOE COVERS (ITEM#4-5) ON TO THE BASES SHOES AND INSERT THE PLASTIC CAP (ITEM#17) ON THE TOP OF EACH POST (UPRIGHT). ITEM# 17 ITEM#1 ITEM#1 LEFT SHOE COVER (ITEM#4) ITEM#17 RIGHT...
  • Page 21 GRID OF THE MASONITE CHART TITLE DRAWING PAGE S RIE S INS-201004 S SERIES I:\dessins\INSTRUCTION\INS-201\INS-201004.idw...
  • Page 22 No shelves or accessories should project past Do not combine Etalex products with non the front of the base shelf. Etalex products. Do not move an assembled unit, especially Local codes and regulations concerning if merchandised.
  • Page 23 UNBALANCED LOAD CALCULATION FOR A WALL SECTION HEAVY LOADED OR WHEN LOADING OR UNLOADING AN ISLAND. IT IS VERY IMPORTANT TO DETERMINE THAT YOU WILL NOT CREATE AN UNBALANCED LOAD THAT WILL EXCEED THE LIMIT PERMITTED. THE EXAMPLE SHOWN BELOW WILL SHOW YOU HOW TO CALCULATE IF YOU HAVE AN UNBALANCED LOAD IN LBS/INCH.