Storage; Transportation; Electric Scheme (Qp,Qpm) - Enarco QGH 25/45 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.3.2 MAINTENANCE WITH ELECTRIC MOTOR
1.-
2.-
3.-
4.-
5.-
6.-
7.-
8.-
service according to the intensity of the usage.
Re-screw the nuts and bolts daily.
Check the oil level in the exciter reservoir every 100 hours (10W 40 non foaming).

4.4 STORAGE

Always stock the screed in a clean and dry area when not used for a long period of time.

4.5 TRANSPORTATION

Make sure the screed won´t suffer any ripping or shock that could cause any damage.
5

ELECTRIC SCHEME (QP,QPM)

en
CABLE SCHEME FOR ONE PHASE MOTOR CONNECTED AT 220 V (QPM)
1.- PLUG 2P+Earth (103704)
3.-EARTH CABLE (green-yellow) 2,5mm2
5.-SWITCH BOX (103739)
7.-CABLE FROM SWITCH TO MOTOR SECTION 2,5 mm2 8.-TERMINAL BOX
9.- CONDENSATOR 30μF/450V
11.- CENTRIFUGAL SWITCH
8
The operating of the electric parts must be done by a specialist.
During the maintenance, secure that the device is disconnected from the power source.
Always use original parts by every maintenance operation.
The bearings of the motor do not need a periodic maintenance.
Inspect the plug, the socket as well as the cables every 100 Hours.
Periodically clean hose of the motor to prevent an overheating.
The safety fittings have to be checked after every maintenance.
Every 12 months or more frequently the screed has to be sent to an authorized workshop for
2.-CABLE TO SWITCH SECTION 2,5 mm2
4.-EARTH CONNECTION POINT
6.-SWITCH (103718)
10.- MOTOR (104221)
FIXED AND EXTENSIBLE VIBRATING SCREEDS

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Qg 25/45Qp 25/45Qpm 25/45QgQghQp ... Afficher tout

Table des Matières