Vulcan GH Serie Manuel D'installation Et D'utilisation page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Replace back tops and top castings onto range (Fig. 12). Shipping brackets removed in Step 2
are no longer required and may be discarded.
6. Replace riser, backguard or high shelf backsplash panel. Mounting is now complete.
Thermostatically Controlled Griddle Installation
Set metal brick supports and bricks in place.
1. Center Support (1) — Place in center with smooth surface down (Fig. 13).
2. Narrow Supports (2) — Place one on each side with smooth surface down and oval holes to
outside (Fig. 14).
Fig. 11
Fig. 13
Fig. 14
– 9 –
Fig. 12

Publicité

Table des Matières
loading

Table des Matières