Pre-Installation Information; Important - AEG GYT11012CB Notice D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
8
www.aeg.com
1. PRE-INSTALLATION

1.1 Important !

Qualified staff should read very carefully
these instructions before installation
and/or maintenance of the product.
1.2 Before installation and setting to
work
Attention ! The feeding pipes have
to be rinsed thoroughly before the
installation of the mixer, so that no
shavings, welding or hemp residual
or other dirt can be found in the
pipes. Foreign bodies can enter the
mixer through the rinsed pipes or the
general water plant and could damage
the washers/ring washers. In order to
guarantee a long use of the product,
install the angle valve equipped with
filter and clean them regularly.
Before the setting to work, unscrew the
aerator and rinse it very well.
Technical data
Maximum working pressure bar
Recommended working pressure bar
in case of water pressure higher than
bar install pressure reducers)
1.3 Package content (Image 1)
A - Mixer
B - Base
C - Fastening set
D - Spacer for the fastening
E - Gaskets

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gyt12012cbGyt11012sbGyt12012sb

Table des Matières