Télécharger Imprimer la page

Remington Solar SF20 Instructions page 4

Publicité

Les langues disponibles

Les langues disponibles

Step 8
Position the four screws around the flashing. Two screws go on either side, and the remaining
two go on the top and bottom. The side screws should go underneath the shingles. The top and
bottom screws should go on top of the shingles.
Lay a bead of Silicone Sealant over each fastener head and along the edges to seal shingles to the
base or roof decking
Step 9
Lay a bead of Silicone Sealant along the edge of the shaft base to insure a waterproof seal
Step 10
Remove the foam protective cover and adjust the panel. Use the screws and nuts to fasten the
angles.
8 Handy Tips
1. Choose the location carefully to ensure optimal sun exposure through the day.
Check for any shade on the roof created by trees, chimney, or satellite dish.
2. Measure twice and cut once. Take a minute to create a template that will create the
correct dimensions for your cut.
3. Center the Solar Attic Fan approximately 2 feet away from the roof ridge to
facilitate good circulation.
4. Before you begin, gently clean any oil residue from flashing.
5. Use a high quality silicone sealant to ensure a good waterproof seal.
6. You can remove the solar attic fan thermal switch. The fan then will operate only
when there is sunshine, and shut off at dusk.
- 4 -

Publicité

loading

Ce manuel est également adapté pour:

Sf25Sf30