Installation Requirements - FS AC32 Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Back Panel Button
Button
Power ON/OFF
Front Panel LEDs
LED indicator
PWR
HDD

Installation Requirements

Before you begin the installation, make sure that you have the following:
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ-45 Ethernet cables and fiber optical cables for connecting network
devices.
2
VGA
Description
Control the controller power on or off.
PWR
HDD
Status
Description
Off
The power module is not in the position or fails.
Solid Green
The power module is operational.
Solid Red
The hard drive is reading and writing.
ON
OFF
110-220VAC 50-60Hz
ON/OFF Power Supply

Publicité

Table des Matières
loading

Table des Matières