Zephyr Gust AK7100AS Guide D'utilisation, D'entretien Et D'installation page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hood is designed for installation under a
kitchen cabinet
options.
3. Reinforce cabinet with 1"x2" wood strips
if additional strengthening is required or if
cabinets are framed.
4. Temporarily position the range hood in the
desired mounting location. Measure and
mark the mounting holes, duct and electrical
locations with a pencil.
5. Drill/cut out the required openings for duct and
electrical access; make sure the duct opening
is large enough to apply duct tape.
screws provided.
7. Install electrical.
8. Install duct work and seal with duct tape.
10. Power up hood and check for leaks around
duct tape.
11. If recirculating the hood refer to page 11 for
more details.
Fig 3
Push in on panel latch then pull panel down
Fig 4
13
8. Electrical
6. Duct
opening/
cutout
9. Aluminum duc
tape
4. Add 1"x2"
wood strips
2. Mesh
filters

Publicité

Table des Matières
loading

Table des Matières