Goldline Controls Sense And Dispense Guide De L'utilisateur page 18

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Plumbing the Probe Cell to the pool plumbing
The Probe Cell requires connection to the pool plumbing using the supplied 8mm flex tubing.
Two ports on the Probe Cell, influent and effluent, are connected to tube fittings on the supply
and return sides of the pool plumbing. Refer to diagram below as well as the following steps:
From
Spa
Supply
Side
From
pool
Installing the return side tube fitting: Drill a 10mm hole on the return side of the pool plumb-
ing at a location just downstream of the filter, but upstream from the Electrolytic Cell. Place
the gasket on the tube fitting and insert the tube fitting into the hole as shown below. Fasten
the tube fitting with the provided hose clamp. With the tube fitting securely fastened to the
pool pipe, insert the flex tubing firmly into the fitting and secure by hand tightening the plastic
retaining nut.
Retaining
Nut
Tube
Fitting
Run the flex tubing from the tube fitting to the influent Probe Cell port. Push the flex tubing all
the way into the pressure fitting to seat into the port.
Effluent
Influent
Port
Sample
Stream
Port
Filter
Return
Side
Pump
POOL
Hose
Clamp
Gasket
Port
Heater
Switch
4
Acid
Cell
Flow
Injection
of acid
Peristaltic
pump
Return to
Spa
Return to
pool

Publicité

Table des Matières
loading

Table des Matières