Installation Guide Danfoss Link™ HC
Actuator Settings
7
Select type / OK
5.5

Configuring a room

Configure Room
1
Heating regulation
5.6

Performing a network test after adding new devices

After finishing installation, perform a network test to ensure that communication between added
devices and the Danfoss Link CC™ is stable.
Note! Do not perform the network test before the Danfoss Link™ CC is mounted in its final position.
Service Options
1
Status and Diagnostics
At the end of the network test the Danfoss Link™ CC awaits for all battery operated devices to wake
up and report. Follow the instructions given on the screen. If the network test is running smoothly,
there will be no need for further interaction. If the network test is performing slow, the Danfoss Link™
CC guides through troubleshooting and gives useful tips for speeding up the process.
5.7
Leaving the service area in Danfoss Link™ CC
Press the SETUP pin for 3 seconds and put back the front cover to the Danfoss Link™ CC.

6. Maintenance

6.1

Removing an output

Service Options
1
Rooms and Devices
10
2019.09
?
Heating Regulation
2
Select type
?
Status and Diagnostics
2
Network
?
Rooms and Devices
2
Manage Devices
?
VIFZL55X
Forecasting method:
By activation of the forecast
method, the system will auto-
matically predict the heating
start-up time necessary to
reach desired room tempera-
ture at desired time.
?
Wireless Network Status
3
Start Network Test
?
Select Room
3
Select existing room
?
Danfoss Heating Solutions
?
?