Zephyr Milano ZMI-M90BS Guide D'utilisation, D'entretien Et D'installation page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

D
n .
m i
E
n .
m i
x . F
m a
Standard
Hood Heights
Duct Cover
minimum ducted (A) 26-
"
1/2
minimum recirculating (B) 31"
maximum (C) 50"
Ceiling Heights
minimum ducted (D) 88-1/2" (7' 4-
minimum recirculating (E) 93" (7' 9")
maximum (F) 120" (10' )
DUCTING
A minimum of 8" round duct is recomended to
Always use rigid type metal ducts only. Flexible
ALWAYS, when possible, reduce the number of
transitions and turns. If a long duct run is required,
increase duct size from 8" to 10".
If turns or transitions are required: Install as far
A
away from duct opening and as far apart between
n .
m i
B
n .
the two transitions as possible.
m i
x . C
m a
Minimum mount height between range top to hood
bottom should be no less than 26".
i n .
Maximum mount height should be no higher than
" m
a x .
2 6
34".
" m
3 4
It is important to install the hood at the proper
mounting height. Hoods mounted too low could
mounted too high will be hard to reach and will
"
3 6
If available, also refer to range manufacturer's
height clearance requirements and recommended
Extension
Duct
Cover
heights up to 12 feet. Turn to page 20 for part
42"
46"
number and ordering information.
80"
) 104" (8' 8")
1/2
108" (9')
DAMAGE-SHIPMENT / INSTALLATION:
150" (12' 6")
• Please fully inspect unit for damage before
installation.
• If the unit is damaged in shipment, return the
unit to the store in which it was bought for
repair or replacement.
• If the unit is damaged by the customer, repair
or replacement is the responsibility of the
customer.
be made by arrangement between customer
and installer.
6
www.zephyronline.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Milano zmi-m90bg

Table des Matières