Installation
2
10
1
5
4
6
9
8 3
1 Wall mounting bracket
2 Back half of the insulation
3 Drain valve
4 Ball valve with integrated non-return valve
5 Fill valve
6 Pump
7 Pressure gauge
8 Flowmeter
9 Front half of the insulation
10 Safety valve 6 bar
Î Determine the mounting site of the station.
Î Mark the drill holes by means of the stencil en-
closed, then drill and insert wall plugs (see figure
to the right).
Î Take the station out of the packaging.
Î Remove the front half of the insulation. Leave the
4
pump station attached to the back half of the in-
sulation!
Î Fasten the pump station to the wall with the en-
closed screws. For this purpose, use a crosshead
screw driver.
Î Connect the pipework between pump station
and store and collector respectively.
7
Note
All connections are already tightened such
that they usually do not have to be tight-
ened again. However, during commissioning
of the system all connections have to be
checked for leaks (pressure test).
Note:
In order to absorb the strain of the pipes,
corresponding fittings (expansion bushings)
or bends are necessary.
The distance between the bends has to be
twice as large as the diameter of the pipe
in cm.
[Example: diameter of the pipe = 18 mm;
distance between the bends = more than
36 cm].