KINTERA KCO-1-N Manuel D'installation Et Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DOUBLE DECK STACKING STRUCTIONS
Double-deck ovens are shipped as single deck
ovens and must be assembled on site by the
installer. Ovens shipped as single deck oven can
be stacked in the field (additional parts are
required.) This installation step describes the
procedure for stacking tow single-deck ovens to
form a double-deck oven.
 Uncrate both ovens in the area to be
stacked. Identify with of the oven will be on
the bottom. Attached either the legs or
casters that are in the Stacking Kit to the
bottom oven as shown below.
 Remove flue assembly from both top and
bottom oven.
 Carefully lift top oven onto the bottom
aligning the top and bottom locator
holes.
 Install stacking bracket as shown. This
will prevent the top oven from moving
on the bottom oven.
Install flue riser to both ovens. *Note: If
not installed correctly or not at all
warranty will be void.
 If you choose to make one gas
connection, it is recommended that a
minimum of two (2) ¾" NPT
connections will be required.
Owner's/Installer Manual Rev 20180822
9
For Warranty Service Call 866-909-2855

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kco-1-p

Table des Matières