Certikin HPP040 Manuel D'instructions page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
TECHNICAL MANUAL. START-UP AND OPERATION
8 ESSENTIAL POINTS.
1.
Check unit condition upon receipt. If the unit is damaged or if the shipment is not complete, make a note in
the delivery note and send an immediate complaint to the company that forwarded the shipment.
2.
It is essential that the installer receives the installation manual. Read the manual and follow the safety, use
and handling instructions of the product carefully. Keep the manual for further reference.
3.
When washing the purification filter, the heat pump must be off. In the event of any maintenance or repair
manipulation in the heat pump, it is obligatory to switch off the power supply. You should not try any kind of
repair work in the heat pump. A qualified installer should be called. He will take it upon himself to return the
faulty unit to the manufacturer. In order to guarantee the correct operation of the pump it is necessary to
make a periodic maintenance of the pump, to make a good use of the pump and not to exceed the limits set
by the manufacturer.
4.
The installation must be made by qualified technical personnel. These personnel commit themselves to
observe the instructions of the manufacturer and the applicable regulations. They also must have available
standard issue material and must guarantee their training in refrigeration facilities. The manufacturer should
not be responsible for any damage in the installation that may cause damages to animals, objects or
people. The manufacturer should not be responsible either for any wrong manipulations by the installer.
5.
This heat pump should be used for the purposes it has been built for. Any other use which does not conform
will be considered dangerous. The safety in the operation of the heat pump could be compromised by the
lack of observance of the previous points. The damages caused by errors in the installation, use or due to
the lack of observance of the instructions or applicable regulations are excluded from any guarantee.
6.
In the case of sale to third parties, it is advisable to include this manual with the heat pump, in case the new
client or installer wishes to consult it.
7.
The machine can take of 2 to 3 days in warming up the water until the wished temperature depending on
the initial conditions.
8.
The machine must work with filter.
(Read carefully before start-up)

Publicité

Table des Matières
loading

Produits Connexes pour Certikin HPP040

Table des Matières