Operating instructions
EN
1. Installation
• According to the operation height, firstly install the lower supporting seat (3) on the vertical supporting steel pipe with an outside diameter of
48 mm and a wall thickness of more than 3 mm, then connect the clamp block (1) and the lever supporting seat (3) with M12x55 bolts (17),
M12 nuts (14), Ø 12 spring washer (15) and flat washer (16) and fix them together. (The tightening force of the bolt should be more than 65 N.m.)
• Fix the upper supporting seat (2) and the clamp block (1) on the supporting steel pipe in the same way. Pay attention that the two supporting
seats must be in the same direction and the vertical distance between their connecting bolts is 380 mm. Overlap the hole on one end of the
supporting rack post (4) into the rotation shaft of the upper supporting seat (2).
• Insert the rotation shaft of the external rack pipe (5) into the hole of the lower supporting seat (3), insert the flat washer (7) in the middle and
fix with the split pin (13). Than insert the internal rack pipe (6) into the external rack pipe (5) (the side with the hole faces outwards), connect
the supporting rack post (4) and the internal and external rack pipes (6) and (5) with M10x70 bolt (11), M10 nut (9), Ø 10 spring washer (10)
and Ø 10 flat washer (11) and fix them together.
2. Operation
• Before operation, carefully check all the structural parts and make sure that the supporting steel pipe must be firm, all the structural parts
of the rack must not be damaged or have cracks and the fastener must not loosen.
No.
Name
1
Clamp Block
2
Upper Supporting Seat
3
Lower Supporting Seat
4
Supporting Rack Post
5
External Rack Pipe
6
Internal Rack Pipe
7
Flat Washer
8
M10X90 Bolt
9
M10 Nut
10
Ø10 Spring Washer
11
Ø10 Flat Washer
12
M10x70 Bolt
13
Open Pin
14
M12 Nut
15
Ø12 Spring Washer
16
Ø12 Flat Washer
17
M12x55 Bolt

Declaration of Conformity

A
lbert Kerbl GmbH • Felizenzell 9 • 84428 Buchbach • Germany
We, the company Albert Kerbl GmbH declare our sole responsibility that the product
Item: Rotary Hoist Frame, 37122
to which this declaration relates is in conformity with the following standard: ISO12100:2010
According to the provisions of directive: 2006/42/EC (machine directive)
Representative for the compilation of technical documents:
Robert Numberger, Albert Kerbl GmbH, Felizenzell 9, 84428 Buchbach, Germany
Any modification to the machines made without our consent will render this declaration null and void.
• The supporting steel pipe must be vertical so as to make the rack
Qty.
Material
• Within the distance range of 750 mm away from the rotation shaft
2
Q235/ZG45
1
ZG45
1
ZG45
• When it slings the weight of 250 kg of below, the distance can be
1
Q235
1
Q235
1
Q235
• The weight to sling must not exceed the max. load rating valve.
1
• When it slings a weight, no person is permitted to stand under
1
• Caution: The fixing ring 1 (large size) and the fixing ring 2 (small
1
1
1
3. Overhaul and Maintenance
1
• Periodically check the supporting steel pipe so as to make sure there
are no phenomena of rocking and bending, etc. • Often check every
2
structural part of the rack so as to make sure there are no conditions
of damaging and cracking etc. • Before using the rack, you must
4
check every fixed position so as to make sure it can't loosen. • If there
4
is any abnormal situation, you must immediately stop using it and
overhaul or replace it. • You must be ready to pay attention to the rigi-
4
dity and verticality of Ø 48 steel pipe. • Is strictly forbidden to use two
4
electric hoists to sling or support a weight simultaneously.
4
turn smoothly toward the right. The axis of the rack pipe must be in
the horizontal position so as to make the steel cable wind neatly.
of the rack, the msximum sling weight is 600 kg. This moment fix
the hoist on the external rack pipe with the fixing ring 1 (large size).
(The internal rack pipe must not be drawn out). (See Figure B).
lengthened to 1100 mm. This moment fix the hoist on the internal
rack pipe with the fixing ring 2 (small size). (Pay attention that
10x70 bolt must pass through the round stop block on dismoun-
ting and the spacing pin (8) must be installed). (See figure C).
the rack.
size) are the parts for installing electric hoist but not the accessories
of the rack. Be sure to take notes to distinguish them on installation.
Buchbach, 20.08.2015
Albert Kerbl, Managing Partner