Table Des Matières; Important; L'entretien De Votre Base De Douche; Care For Your Acrylic Shower Base - Fleurco ABV3248 Mode D'emploi

Table des Matières

Publicité

● Table des matières

IMPORTANT .................................................... 2
OuTILs eT MATÉRIAux ReQuIs. ............................. 3
sPÉcIfIcATION. ............................................... 4
1. INsTALLez LA BRIDe De cARReLAGe. ................... 5
3. INsTALLez Le DRAIN. ..................................... 6
4. NIveLez LA BAse. ......................................... 6
5. TesTez Le DRAINAGe. .................................... 7
6. fIxez LA BAse. ............................................. 7
7. fINITION. ................................................... 8

● IMPORTANT

- Lire attentivement et complètement le manuel
d'installation avant de procéder.
- Il est recommandé de porter des lunettes de sécurité en
tout temps lors de l'installation.
- ce produit est couvert d'une pellicule protectrice;
Ne pas retirer jusqu'à ce que l'installation soit terminée
pour offrir une protection supplémentaire.
Toutefois, retirer film aux endroits où deux surfaces sont
en contact permanent lors de l'installation.
- Avant l'installation de la base, tous des travaux de
l'ossature et de plomberie doivent être réalisé par
un professionnel qualifié conformément aux codes
municipaux établis.
Pour les travaux de rénovation, des surfaces de douche
doivent être enlevées pour répondre aux exigences de
l'ossature.
S'assurer que les parois extérieures sont correctement
isolées et que le coupe-vapeur a été installé
conformément aux codes du bâtiment.

● L'entretien de votre Base de Douche

- Pour protéger le fini acrylique de votre base, n'utilisez
jamais de poudre ou tampons de récurage ou d'autres
solvants forts. Nettoyez la base avec une solution d'eau
et détergent doux ou un détergent conçu spécifiquement
pour de l'acrylique.
Des changements peuvent être apportés au
produit sans préavis. Veuillez donc utiliser les
instructions fournies avec le produit.
04.19
● Table of Contents
IMPORTANT .................................................... 2
TOOlS AND MATeRIAlS ReQuIReD. ........................ 3
SPeCIfICATION. ............................................... 4
1. INSTAll TIlING flANGe. ................................. 5
2. PRePARe DRAINING PIPe. ................................. 5
3. INSTAll The DRAIN. ...................................... 6
4. levelING The BASe. ...................................... 6
5. TeSTING The DRAINAGe. ................................. 7
6. SeCuRING The BASe. ..................................... 7
7. fINIShING. .................................................. 8
● IMPORTANT
- Read this manual carefully and completely before
proceeding.
- It is recommended that you wear safety glasses at all
times during the installation.
- This product is covered with a protective film;
Do not remove it until the installation is completed to
provide additional protection.
However, do remove film where two surfaces are in
permanent contact during the installation.
- Prior to installation of the base, all framing and
plumbing work must be completed by a qualified
professional in accordance with local established
building codes.
for renovation work, existing shower surfaces must be
removed to accommodate framing requirements.
ensure that outer wall are properly insulated, and that
a vapor barrier has been installed in accordance with
local established building codes.

● Care for your Acrylic Shower Base

- In order to protect the acrylic surface of your base,
never use scouring powder pads or other strong solvents.
Only clean it with a mild detergent diluted in water or a
dertergent formulated specifically for acrylic.
Product specifications are subject to change
without notice. Use the installation instructions
supplied with the product.
ABV3248 | ADQ3260BF-L | ADQ3260BF-R
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Adq3260bf-lAdq3260bf-r

Table des Matières