Télécharger Imprimer la page

Fortress Building Products FortressAccents 60W Instructions De Montage page 3

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Step 1:
Install Transformer
1.
Determine the best location for the transformer based on your lighting layout.
The transformer should be located within 15' [4.5m] of the first LED Light. The
supplied input wire with plug must be connected to a GFCI protected outlet with a
hooded flush type cover plate receptacle marked "Wet Location". DO NOT use an
extension cord.
2.
The
Transformer must be installed more than 12" [305mm] above the
As shown in Fig. 1.
3.
Place transformer in desired location and use the provided screws to mount.
As shown in Fig. 2.
Tip:
If no GFCI protected outlet with a hooded flush type cover plate
receptacle marked "Wet Location" is available, a licensed electrical
contractor must install a GFCI outlet at the required location.
Fig. 1
GFCI Outlet
Step 2:
Install FA 60W 18-2 GA Adapter or FortressAccents Plug & Play Wire
Adapters
1.
If installing FortressAccents LEDs with Plug and Play connectors, use the FA
60W Plug and Play Adapter. If installing FortressAccents LEDs with Wire Nuts,
use the FA 60W 18-2 GA Adapter. Secure the required adapter to the transformer
with the threaded connector.
2.
If using the
negative outputs. As shown in Fig. 2.
3.
If using the
options to connect the adapter to the LED system As shown in Fig.
Note:
When connecting
maintain polarity (positive to positive, negative to negative).
Connectors sold separately.
Fig. 1
Adapter
Output Wire
Minimum 12"
[305mm]
As shown in Fig. 1.
FA 60W 18-2 GA
Adapter, attach Wire Nuts to both positive and
FA 60W Plug and Play
FA 60W 18-2 GA Adapter
Fig. 2
Connects To
Transformer
Fig. 2
Adapter, use one of the three connector
with FortressAccent system, be sure to
Fig. 3
Connects To
Connects To
LED Lights
Transformer
ground.
3.
FA PNP Line
Connector
Connects To
or
LED Lights
FA PNP
T-Splitter
or
FA PNP 6-Port
Quickfit Splitter
3

Publicité

loading