Télécharger Imprimer la page

VivaPool Fresh 4 1155 63310 Mode D'emploi page 5

Publicité

Les langues disponibles

Les langues disponibles

MOUNTING THE SHOWER: CONCRETE/MASONRY INSTALLATION ONLY
1. Choose a location for shower that receives the most direct sunlight.
2. Use the main unit to mark the position of the mounting holes to be drilled into concrete/masonry for bolts.
SEE FIGURE 1.
3. Remove shower. Drill
1
/
" diameter holes, 1
3
/
" deep, using the marks just created.
2
4
4. Insert Expansion Nuts into holes. Place the bolt inside the expansion nut and TAP with a hammer to slightly expand the nut.
5. Remove Bolt and place the base plate/lower tube over the holes and secure to surface with bolts and washers provided.
NOTE: Base plate will appear loose until shower is fully secured to the surface.
Figure 1

Publicité

loading