Suncast 4800SPTBD Instructions D'assemblage page 7

Table des Matières

Publicité

Assembly / Assemblage
J
6 8
7
M
N
O
P
Q
R
STEP 7 EN: For multiple locker installation, use pegs (4) to attach locker to other locker(s). CAUTION: When used in groups, individual lockers must be pegged to each other at the top/
bottom and/or sides in addition to attaching each locker to a wall. STEP 8 EN: Apply logo and personalization decals to front of door at locations shown.
Large Oval (N)
Upper Arc (M)
Lower Arc (O)
Small Oval (R)
Locker User's Name (P)
NOTE: For centered placement, begin with middle letter, place in center of name slot and work outward. Locker User's Jersey Number / or graphic rectagles (F)
NOTE: If necessary, decals may be removed by using a blow dryer to soften adhesive. Place blow dryer on "hot" setting. Direct air flow at decal to be removed for approximately one minute.
ETAPE 7 FR: Pour l'installation d'armoires multiples, utilisez des chevilles (4) pour fixer l'armoire à d'autres armoires. MISE EN GARDE: Lorsqu'elles sont utilisées en groupes, les
armoires dovient d'abord être fixées les unes aux autres à l'aide des chevilles (dans le haut, au bas et sur les côtés) avant que chacune d'elles ne soit fixée à un mur.
ETAPE 8 FR:
Placez des autocollants de logo ou personallisés sur le devant de la porte, aux endroits indiqués.
Ovale grande(A)
Arceau supérieur (B)
Arceau inférieur (C)
Ovale a petit(D)
Nom de l'utilisateur de l'armoire (E)
REMARQUE: Pour bien centrer, commencez par la lettre du milieu, placez-la au centre de la fente du nom et procédez vers l'extérier.
Numéro de maillot de l'utilisateur de l'armoire/ ou rectangles graphiques (F)
REMARQUE: Au besoin, les autocollants peuvent être enlevés en utilisant un séchoir pour ramollir la colle. Réglez le séchoir à "chaud". Dirigez l'air chaud vers l'autocollant à enlever
et attendez environ 1 minute avant d'enlever celui-ci.
7

Publicité

Table des Matières
loading

Table des Matières