Télécharger Imprimer la page

aldes C.Integra Notice D'installation Et De Maintenance page 17

Publicité

Les langues disponibles

Les langues disponibles

2.3. Electrical connection and commissioning
Plug the power lead into the 230 V socket.
Connect the 24 V lead to the suction inlets in the dwelling.
Insert the dustbag into the drawer taking care to fi x it properly using the clip provided for this purpose.
Move the run button to ON.
Caution: the unit will be connected to the power supply by a professional as per the rules of standard
NF C 15-100.
2.4. Connection to the suction ductwork
Connect the fl exible hoses provided to the unit's suction inlet and exhaust. Connect the fl exible hoses to your suction and exhaust ductwork without
sticking them (to allow subsequent maintenance).
 
Caution: Do not stick
Whenever possible (type of unit and accommodation confi guration), we advise discharging the suction air outside the dwelling.
2
Diameter 100 mm passage on minimum 0.5 m in front of the grille
1
using a reducing plug
3
Grille characteristics on façade: minimum 100 mm diameter with
minimum air passage of 78 cm2
Start-stop switch
230 V connection
for power lead
Low voltage connection
for suction inlets
17
Exhaust
Air inlet
2
1
2 coudes 90° Max.
2 90° elbows max.
EN
3

Publicité

loading