Masquer les pouces Voir aussi pour INITIAL:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Complete the connections and purge the air. Before opening the water inlet into the installation,
At its fi rst start-up, the device displays after a few seconds the message SERV, fi rst step of the set-
ting, which uses 4 keys:
Key
Name
Menu
Left / Menu
é
Up
êR
Down
Enter
Enter
The following steps are necessary and suffi cient to set the softener.
You just need to know the hardness of the raw water (concentration in lime scale), measured before
or known from the public water distribution network.
First push 3 seconds on the key M, until the message LANG appears on the display.
Message
Step n°
displayed
LANG
_ :_
1
FR
_ :_
24
Manual SOFTENER FER27-A6X code P0011148 - Rev 1 - 15/03/2017

SETTING

• Activates the menu with a long push (5 seconds)
• Ongoing setting cancellation without record
• Up move within a list of choices
• Increase / change of a parameter
• Down move within a list of choices
• Decrease / change of a parameter
• A long push (5 seconds) triggers a manual regeneration. During
this process, a brief push forces the trigger of the next step.
• Enter into a menu
• Setting validation
Purpose
Change language if necessary
Language selection
purge and rinse properly the pipes upstream from
the bypass.
Connect the inlet and outlet fl exible hoses (13) to
the network pipe, by paying attention to the water
fl ow direction.
Progressively open the bypass tap (or the
upstream cutting valve of the installation).
Purge the remaining air by using the purging
screw upon the fi lter (unscrew it, then screw it
back once the air is purged).
Plug the softener to the electricity outlet.
Function
Default value is French
Enter
to change
Menu
to cancel
êR é
to select
Enter
to confi rm
Menu
to cancel
How to do

Publicité

Chapitres

Table des Matières
loading

Table des Matières