Operating Requirements And Important Notes; Service Water Connection - Austria Email HR 200 Notice D'utilisation Et De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. operatIng requIreMents and IMportant notes

This appliance is intended only for heating water within enclosed spaces and may be installed only by approved specialists
(in accordance with the relevant norms, such as ÖNORM B2531-1).
The appliance may be used only under the conditions specified on the specification label (such as: ÖNORM H 5195-1).
The tanks are intended for use only under the conditions specified on the specification label.
In addition to the legally recognized national regulations and norms (Austria: ÖVE, ÖNORM, etc.), the connection require-
ments of the local electric and water utility companies as well as the installation and operation manual must be adhered to.
The hot water preparation must conform to the prevailing norms (such as ÖNORM H 5195-1).
The area in which the appliance will be used must be kept above freezing. It must be installed in a location which allows for
access in case of any necessary maintenance, repair or replacement. The costs for any necessary changes to the struc-
tural conditions (e.g. doors and passages too narrow) are not governed by the guarantee and warranty declaration and
therefore shall be rejected on the side of Austria Email AG. This means that any construction which hinders work on the
appliance must be removed by the customer. When erecting, installing and operating the water heater in unusual locations
(e.g., attics, interior rooms with water-sensitive floors, closets, etc.), provision must be made for possible water leakage
and means provided for catching the water with a corresponding drain to avoid secondary damage. The appliance may
be installed and operated only in the intended configuration and on a horizontal surface which is appropriate for the weight
of the tank when it is full of water. When water with high lime content is used, we recommend installing a commercially
available water softener and operating at a maximum temperature of approx. 65°C.
5. serVIce Water connectIon (pressure-tIght)
All water heaters which indicate a rated pressure of 10 bar (formerly: atü or kp/cm2) on the specification label (in Switzer-
land 6 bar atü kp/cm2) are pressure-tight tanks and can be plumbed pressure-tight with the corresponding line pressure
(in Switzerland 6 bar/atü).
If the line pressure is higher, a pressure reducing valve provided by the user must be installed in the cold water
supply line.
If inappropriate or non-functioning fittings are used, or if the specified operating pressure is exceeded, all guarantees,
warranties and product liability for our water heaters are void. Therefore only pressure-rated fittings may be used. Com-
ponent-inspected safety devices are to be provided in the cold water supply line according to the connection diagram
shown below. A prototype-inspected safety group to DIN 1988 or ÖNORM B2531-1 for closed water heaters must be
installed in the cold water line.
The water connection may be made only through an inspected membrane safety valve or membrane safety valve com-
bination fitting (not a piston valve)! A safety valve combination consists of a shut-off, test, non-return, waste and safety
valve with expansion water drain and is installed between the cold water feed line and cold water inlet of the tank in the
order shown:
Tank connection to DIN 1988 and ÖNORM B2531-1:
Always observe the following:
To ensure proper function of the fitting, the latter must be installed only in a frost-protected space. The safety valve runout
must be open and visible and the waste line of the drip catcher (expansion water funnel) must be routed to the waste water
duct so that neither frost nor obstructions caused by dirt and such can cause a problem. Ensure that the drip cup or item
to be drained is free of deposits and soiling. No shut-off valve or other restriction may be installed between the safety valve
and cold water inlet of the water heater.
Id.Nr.: 241525-0 DE - GB - F
GB
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hr 300Hrs 300Hrs 500Hrs 200

Table des Matières