Gladiator Garageworks GARS774XEG Instructions D'assemblage page 6

Rayonnage en acier pour charges lourdes
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
Assemble end frame
P4
Position the two welded-end frames (P4) vertical with the
foot end of each frame at ground level and profile slots facing
forward.
3.
Assemble tie channel supports
Rotate the tie channel support (P3) into the front and back
support beam (P2), aligning the tie channel rivet heads with
the matching large diameter hole of the support beam keyhole.
This shelving unit is equipped with one, two, or three tie
channel supports (P3) for each shelf, depending on the size
of the shelf unit.
NOTE: The tie channel supports (P3) provide load support
and structural integrity. All tie channel supports (P3) must
be assembled as shown.
6
P4
P2
P3
A
P2
C
2.
Align support beams
P2
At the desired shelf location, align both of the support beam
(P2) end tabs with the inside triangular frame slots on the
welded frame (P4).
4.
Rivet inserted into keyhole
P3
B
To insert the rivet head on the other side of the tie channel
support (P3), apply pressure to both sides of the tie channel
support (P3), squeezing the sides toward each other. Insert
the rivet head into the matching larger hole of the support
beam keyhole on the front and back support beam (P2).
Release pressure.
P4
P2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gars774szgGars604tegYgrs604tggGars484tegYgrs484tgg

Table des Matières