IMEON ENERGY 4850 Guide D'installation page 38

Masquer les pouces Voir aussi pour 4850:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Guide d'installation/
Installation guide
4850
Item
cable
Parallel
communication
cable
Communication
cable to the
inverter (optional)
Screws
2.1. Recommended equipment for the installation
This section does not specify the protective equipment
necessary for the intervention and the intervener himself. The
qualification of the worker and the protective equipment must
comply with the standards and regulations in force.
o
The following equipment is recommended for the
installation:
o
o Screwdriver (flat and crosshead)
o
o Multimeter
2.2. Installation
Step 1 - Unpacking
Unpack the battery carefully. Batteries are heavy. Do not lift them by
their poles or cables.Check the contents of the box (see §2.2)
IM4850DA_guide_installation_v.A.3
Specification
/25mm²/L215mm
Black
/L250mm/Double
RJ45
Black
/L2000mm/Double
RJ45
Battery fixing
screw
Quantity
1
1
1
4
Image
EN
FR
12/22
FR

Publicité

Table des Matières
loading

Table des Matières