Start-Up Of Turbelle® 5005 - Tunze Turbelle e-jet 805 Mode D'emploi

Pompes centrifuges de haut rendement
Masquer les pouces Voir aussi pour Turbelle e-jet 805:
Table des Matières

Publicité

Start-up of Turbelle® e-jet 5005
Plug the connector (1) of the power supply unit (2)
into the corresponding socket (3) of the pump and
subsequently connect the power supply unit to the
mains (4). The performance of the pump can be set
by means of adjusting screw (5).
Singlecontroller (6) or Multicontroller (7) can be
connected up to the connection of the Turbelle®
e-jet 5005, thus producing Turbelle® kits.
For more precise information on the connection of
Singlecontroller or Multicontroller, please refer to
the corresponding instructions for use.
Automatic shut-down
The pump will be stopped immediately in case of
blockage. After the blockage has been removed, the
pump will start up automatically after a delay of 20
seconds. The pump control is thermally protected.
The power supply unit is protected against short-
circuit and thermal overload.
Mise en service Turbelle® e-jet 5005
Raccordez le câble (1) de l'alimentation secteur (2)
dans la prise (3) de la pompe puis branchez
l'alimentation sur le secteur (4). Le potentiomètre (5)
permet de varier la puissance de la pompe.
Le boîtier de raccordement de la Turbelle® e-jet
5005 est conçu pour recevoir un Singlecontroller (6)
ou Multicontroller (7), formant ainsi des Kits de
brassage Turbelle®.
Vous trouverez plus d'informations concernant le
raccordement de Singlecontroller et Multicontroller
dans les notices respectives.
Arrêt automatique
En cas de blocage, la pompe est immédiatement
mise hors service. Après suppression de ce blocage,
la pompe redémarre automatiquement avec une
temporisation de 20 secondes.
Le pilotage de la pompe possède une protection
thermique. L'alimentation secteur est protégée contre
les courts-circuits et les surcharges thermiques.
39

Publicité

Table des Matières
loading

Table des Matières