Installing Your Appliance; Environmental Protection - Fagor 9 CFV 92 IX Guide D'utilisation

Masquer les pouces Voir aussi pour 9 CFV 92 IX:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23

2 / INSTALLING YOUR APPLIANCE

• ENVIRONMENTAL PROTECTION

— The ceiling must can bear at least 40kgs
weight, and the thickness of the ceiling must
be
30MM, see pic 2, drill 1*170mm round
hole in the ceiling.
— According to the hanging board, drill
12 holes in the ceiling, see pic 2, 12pcs of
ST6*40mm big fl at screws will be used to
fi x the hanging board on the ceiling, and
then 8pcs of M4*10 screws and M4 nut
with gasket will be used to connect the
angle iron into the hanging board, see pic
1, calculated the length of the angle iron,
and 16pcs M4*10 big fl at screws and M4
nut with gasket will be used to connect
the angle iron and another angle iron ( the
overlap length of angle iron can not less
100MM)
— Let the one side of the extensible pipe
go outside through the hole of 170MM, see
pic 3.
— 4pcs ST4*8 big fl at screws will be used
to connect the internal chimney into the
hanging board, then put one the external
chimney, two hooks will be used to put up
the external chimney in order to the next
installation, see pic 4.
17
EN
Pic 1
Pic 2
Pic 3
Pic 4

Publicité

Table des Matières
loading

Table des Matières