Télécharger Imprimer la page

habitat et jardin Fresh 8 1365 93339 Notice D'utilisation page 5

Publicité

Les langues disponibles

Les langues disponibles

20 LITER SOLAR SHOWER INSTRUCTIONS
Assemble Instructions
Set up your solar shower in a place that is exposed to direct sunlight as long as possible.
1. Mount the shower base to concrete slab or wood base with four bolts, nuts and gaskets.
Recommend use a spanner.
2. Connect hose adaptor to inlet of shower.
3. Connect garden hose to hose adaptor and water supply.
4. Connect holder to shower body. Don't forget the gasket.
5. Connect shower head and flexible hose to both ends of holder.
First Usage
1. Turn the shower handle to FULL ON HOT position.
NOTE: Filling tube with valve in hot position ensures no air pockets are trapped in
shower. This procedure is used for first usage only.
2. Turn on water supply to garden hose to fill the shower. It will take 3 to 4 minutes to fill up the shower.
3. When water flows from shower head, turn the shower handle off. Turning shower handle off makes
water begin heating in tube.
4. Depending on sunlight and outside temperature, the shower will take two to three hours to fully heat
water.
5. WARNING: To avoid scald, pay attention to turn shower handle to cold water (blue) direction
before using the shower. Then setting to desired temperature.
Winterization
1. Turn off and disconnect garden hose.
2. Open handle to full on hot position and allow water to drain from draining hole (about 5 to 6
minutes).
NOTE: Don't tough or turn shower handle while draining water, otherwise water will stop draining.
3. Clean and dry the shower parts.
4. Move shower from outdoor to indoor. Store it in dry and warm place during winter season, and
prevent it from frostbite.
Warning
1.DO NOT USE SALT WATER OR ANTI-FREEZINE METHODS.
2.WATER PRESSURE: MAX 3.5 BARS
3.ALWAYS START YOUR SHOWER FROM COOL TO AVOID SCALD.
5

Publicité

loading