Electrical Installation; Overhead Rigging - JB Systems Light Plano Spot LED Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
 The housing and the lenses must be replaced if they are visibly damaged.
 Please use the original packing when the device is to be transported.
 Due to safety reasons it is prohibited to make unauthorized modifications to the unit.
Important: Never look directly into the light source! Don't use the effect in the presence of persons suffering
from epilepsy.
DESCRIPTION:
1. Front with hard plastic cover to protect the
5mm LEDs.
2. Hanging bracket with knobs on both sides to
fasten the unit and a mounting hole to fix a
mounting hook.
3. ¼" jack used to connect the optional CA-8
controller
4. Mains input with IEC socket and integrated
fuse holder, connect the supplied mains cable
here.
5. Mains output with IEC socket: you can use a
special IEC power cable to connect this output
with the mains input of the next PLANO LED
for easier linking. (max 40 units can be linked)
6. DMX-output connector
7. DMX-input connector
8. Slave LED: is lit when the unit is in slave
mode
9. Sound LED: blinks to the rhythm of the music
while the unit is in audio mode
10. DMX LED: is lit when the unit receives a
DMX-signal
11. Master LED: is lit when the unit is switched as
master
12. MENU button: used to select the different
menu items
13. DOWN button: to go back in the menu and to lower the values shown on the display.
14. UP button: to go up in the menu and to increase the values shown on the display.
15. ENTER button: used to confirm your choice.
16. DISPLAY shows the various menus and the selected functions.

ELECTRICAL INSTALLATION

Important: The electrical installation should be carried out by qualified personal only,
according to the regulations for electrical and mechanical safety in your country.
Electrical installation for 1 standalone unit:
 Insert the mains cable. The unit starts working immediately in the last selected stand-alone mode.
 Refer to chapter HOW TO SETUP to learn how to switch between static and sound mode.
Remark: You can connect a CA-8 remote controller to the unit if you want to have more control.
Electrical installation for two or more units in master/slave:
 Connect 2 to maximum 16 units together using good quality balanced microphone cables. The unit that
has no cable connected to its DMX-input is the "master", the others are the slave units.
 Make sure that all units are connected to the mains.
 Refer to chapter HOW TO SETUP for more information.
 Done!
Remark: You can connect a CA-8 remote controller to the master unit if you want to have more control
over the master/slave operation. You can also connect the LEDCON 02 remote controller
JB SYSTEMS
®
OPERATION MANUAL
3/50
PLANO SPOT
ENGLISH
Electrical installation for two or more units in DMX-mode:
 The DMX-protocol is a widely used
high speed signal to control intelligent
light equipment. You need to "daisy
chain" your DMX controller and all the
connected units with a good quality
balanced cable.
 To prevent strange behavior of the
light effects, due to interferences, you
must use a 90Ω to 120Ω terminator at the end of the chain. Never use Y-splitter
cables, this simply won't work!
 Make sure that all units are connected to the mains.
 Each light effect in the chain needs to have its proper start address so it knows which
commands from the controller it has to decode. In the section HOW TO SETUP you
will learn how to set the DMX addresses. Remember that each projector uses 4 channels, a possible
address setup could be: unit1 = 001 ~ unit2 = 005 ~ unit3 = 009 ~ unit4 = 013 ~ etc.

OVERHEAD RIGGING

 Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
 Make sure the area below the installation place is free from unwanted persons
during rigging, de-rigging and servicing.
 The device should be installed out of reach of people and outside areas where
persons may walk by or be seated.
 Before rigging make sure that the installation area can hold a minimum point
load of 10times the device's weight.
 Always use a certified safety cable that can hold 12times the weight of the
device when installing the unit. This secondary safety attachment should be
installed in a way that no part of the installation can drop more than 20cm if the
main attachment fails.
 The device should be well fixed; a free-swinging mounting is dangerous and
may not be considered!
 Don't cover any ventilation openings as this may result in overheating.
 The operator has to make sure that the safety-relating and machine-technical
installations are approved by an expert before using them for the first time. The installations should be
inspected every year by a skilled person to be sure that safety is still optimal.
HOW TO SETUP:
MAIN MENU:
 To select any of the menu options, press the MENU button up to when the required option is shown on the
display.
 Select the function with the ENTER button. The display will blink.
 Use DOWN and UP button to choose the desired menu option.
 Once the required menu option is selected, press the ENTER button to select.
Remark: Press the MENU button for about 2 seconds to return to running mode or just wait 8 seconds.
The menu structure is shown below.
JB SYSTEMS
®
OPERATION MANUAL
4/50
PLANO SPOT

Publicité

Table des Matières
loading

Table des Matières