SETUP AND CONFIGURATION

1 - Physical Installation

The XFS-1816P can be rack-mounted or used as a desktop switch.
Install the XFS-1816P in a stable/safe place to avoid any possible damage. Avoid placement in direct sunlight.
Do not place heavy articles on the XFS-1816P and verify the ground connection of the outlet is functioning properly
Desktop/Shelf Installation
For desktop/shelf installation, attach the four rubber feet to the corner indentations on the bottom of the
XFS-1816P, then place the switch horizontally on a solid, level platform.

Rack Installation

Use the included L-brackets for convenient installation in a 19-inch server or audio rack. As shown below, use four
screws to attach the rack ears on both sides of the XFS-1816P, and fix the switch into the rack.
Attach feet for
desktop installation
2 - Connecting Ethernet and Power
Ethernet and Power Connections
Use any RJ 45 to connect the XFS-1816P to an Ethernet-enabled device,
including servers, routers or other switches. No crossover cable is necessary.
The XFS-1816P supports 10/100/1000 Mbps Ethernet; 10/100 Mbps half/full-duplex mode and 1000 Mbps full-duplex
mode. All eighteen RJ 45 ports support Auto MDI/MDIX and can be used as ordinary ports or as Uplink ports. Ports
1-16 are PoE+ and are enabled by default.
Use the included power cable to connect the XFS-1816P to a surge protected outlet. The AC input socket and a power
switch are on the rear panel. The built-in power supply supports 100~240Vac at 50/60Hz.

Network Cabling

If you plan to use a fiber optic link for the network connection, an optical fiber module is required (not included).
CAUTION: Multiple Uplink channels can create loops, resulting in network failure. Ensure only one
Uplink channel exists between switches or between the XFS-1816P and a router.
NOTE: When powering up, the port LEDs corresponding to the optical interface may take a moment
to initialize.
This is normal as the XFS-1816P initialization and startup completes.
NOTE: For optimal switch performance, do not exceed 230W combined consumption of all external
PoE devices.