Elnur Gabarron CCN-2000 Instructions D'installation Et Guide D'utilisation page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Drill holes on the wall according to the instruction inside the
box.
Warning: Be sure to keep the safety distances as shown
on the above drawing.
2. Fit the fasten tube in the hole and fit the bracket on the wall
with screws.
3. Hang the unit on the bracket gently, after ensuring the unit is
right fixed, turn the lock in the bracket as picture show.
Warning: Before using the heater, make sure it's mounted
tightly on the wall.
INSTALLATION
1

Publicité

Table des Matières
loading

Table des Matières