Télécharger Imprimer la page

HOMCOM YH-19 Instructions De Montage page 4

Masquer les pouces Voir aussi pour YH-19:
Les langues disponibles

Les langues disponibles

Lay stove upside down on a padded surface to avoid scratches to the surface of your stove.
Line up holes in the leg with holes in the underside of the stove body. With the use of the
screwdriver secure leg w i th the screws provided (3 screws per leg) as shown in the figure below.
Overheating safety device
If the heater stops working, turn it off and check if the inlet or out l et is blocked. Unp l ug the unit and
wait at least 10 minutes, so the protection system can reset. If the heater still does not work,
contact customer service for inspection or repair.
Before restarting the heater, ensure it has been unplugged for at least 10 minutes.
Cleaning
1. Always unp l ug the un i t before clean i ng.
2. C l ean the outside of the heater by wiping w i th a damp or dry cloth.
3. Do not use petro l eum or any other detergent or chemical so l vent to clean the heater.
4. When the heater has not been used for a while, store in a clean, dry place, away from dust and dirt.
Environmental Protection
Waste electrical production should not be disposed of with household waste. Please recycle
where fac il it i es exist. Check w i th your local authority or retai l er for recycling adv i ce.
4
loading

Ce manuel est également adapté pour:

820-130820-131820-131v90