Before commissioning

Meters with oil pump must be initially lubricated.
Lubricate the meter as instructed in section Lubrication.

Placing the system into operation

To avoid damaging the meter, slowly fill the system. We advise using a bypass
with a maximum diameter of ¼DN. (See Fig.3 for details)
When fully pressurized perform a leak test.
Fig. 3 Bypass to avoid over speeding.